1. A stakeholder wants to modify an existing feature. Which of the following would be used to determine the scope of the change on the product?
A) Project schedule and cost baseline B) Requirements traceability matrix C) Requirements attributes table D) Sequence diagram
2. A business analyst has been assigned to a project to implement a new phone system for a customer call center. The business analyst will need to create a business case. Which of the following components will the business analyst use as input to the business case?
A) Product scope B) Project scope C) Project timeline D) Work breakdown structure
3. During user acceptance testing, a defect is logged by a user from a department that did not participate in the requirements analysis. To avoid this situation and minimize impact on the project, the user should have been:
A) identified as a stakeholder as part of the stakeholder analysis. B) interviewed to understand how the userâ??s work would be impacted. C) involved in the development and sign-off of the business requirements. D) given the opportunity to review the user acceptance test scripts.
4. When a change request is received, the business analyst is responsible for:
A) prioritizing and scheduling the changes requested. B) analyzing the impact to the project schedule and budget. C) analyzing the impact on business and underlying systems. D) ensuring that change-related incidents are minimized in production.
5. What should the business analyst do to ensure that all requirements meet a quality checklist before the development and testing phase?
A) Assign a verification method to each requirement. B) Validate the requirements deemed important by the stakeholders. C) Obtain approval from engineering for partial testing of the requirements. D) Negotiate with the client to standardize the requirements.
1. Right Answer: B Explanation: https://opentextbc.ca/projectmanagement/chapter/chapter-9-scope-planning-project-management/