Inspirational journeys

Follow the stories of academics and their research expeditions

CompTIA PK0-004 Project + Certified Practice Exam Questions and answer - Part 4

Mary Smith

Tue, 21 Apr 2026

CompTIA PK0-004 Project + Certified Practice Exam Questions and answer - Part 4

1. Executive sponsor asked the project manager to summarize them for the project: 1. End investment. 2. The expected cost of new resources used to support the decision. 3. Assessment of the maintenance. Which of the following information should give the project manager?

A) Burn speed
B) None
C) The total cost of the project
D) The cost of a base
E) The cost of the report Deviation


2. The project must supervise the installation of the new reptile habitat at the local zoo. During the execution, the zoo staff decided to take a different type of reptile that will require a different temperature range than the power of the installed system. The change was approved. Which of the following restrictions are likely to be affected? (Choose two.)(Select 2answers)

A) , Schedule, as it was unplanned task, and will affect the timing.
B) Quality, because the current system is now on the doorstep.
C) The cost is the change in the system entails additional costs.
D) Interested parties, because they have to understand, modify and ensure buy-in.
E) Requirements, as it is a change in the lead.


3. The PMO is responsible for: (. Choose two)(Select 2answers)

A) approve funding, project plan development, and requires a high level collection.
B) describe the consequences of failure and coordination between dissimilar projects.
C) establishment of standards and practices of the organization and provides guidance
D) manage the project plan, scale, risk and budget
E) contribute expertise, results, and cost estimates.


4. Project Manager assured the quality of the final product from the SME meets specifications. Which of the following is the best way for the project to address the problem?

A) Send the project team meeting to get feedback from everyone.
B) None
C) Send by e-mail with a description of the team member issues
D) Put the question to the wiki page of comments from interested parties
E) Conduct face-to-face or telephone meeting with a member of the team.


5. Which of the following are characteristics of the project? (Choose two.)(Select 2answers)

A) It comprises the steps of
B) To achieve the goal
C) Restricting the budget
D) Beginning and the end
E) constant
F) temporary

1. Right Answer: D
Explanation:

2. Right Answer: A,C
Explanation:

3. Right Answer: B,C
Explanation:

4. Right Answer: E
Explanation:

5. Right Answer: D,F
Explanation:

0 Comments

Leave a comment