1. An administrator is determining hardware requirements for a new,virtualized test environment. The vendor requires 8Gb of RAM for each host and 2Gb of RAM for each guest. If the server has a total of 32Gb of RAM,which of the following describes how many hosts and guests the server can support?

A) 1 host and 12 guests
B) 1 host and 16 guests
C) 2 hosts and 8 guests
D) 4 hosts and 0 guests



2. An administrator is securing a secure web server by disabling ports. After completing this process,clients cannot access the secure web server. The administrator should now go back and verify whether which of the following ports is enabled?

A) 23
B) 443
C) 389
D) 445



3. An administrator is deploying 1000 new servers in a datacenter. A vendor will install the servers on racks and connect cables. Which of the following technologies would BEST for the administrator to use to install operating systems to all 1000 servers in the shortest time possible? (Select two.)

A) TFTP
B) DVD
C) SFTP
D) UDP
E) PXE
F) USB

4. An administrator is configuring a server for remote access. The administrator wants to be able to power on a server from a remote location. Which of the following needs to be configured on the server to accomplish this task?

A) Configure the serial connection.
B) Configure VPN access on the server.
C) Configure ILO/iDRAC on the server.
D) Configure the boot sequence.



5. A hardware failure affects a server in a datacenter. The server is critical to company operation,and the hardware vendor is out of stock on the parts needed to repair the server. A network technician suggests replacing it with a server from the warm site. Which of the following should the technician do FIRST?

A) Check the DRP and BCP and talk to the company stakeholders before making the decision.
B) Unrack the server from the warm site and move it to the datacenter.
C) Outsource a hardware-certified courier to move the server to the datacenter.
D) Order the parts from the hardware vendor and notify affected users that the server will be down.



1. Right Answer: A
Explanation:

2. Right Answer: B
Explanation:

3. Right Answer: E
Explanation:

4. Right Answer: C
Explanation:

5. Right Answer: A
Explanation: