Home β€Ί Blog β€Ί CompTIA

CompTIA Server+ Certification Exam Questions and answer - Part 75

Mary Mary Smith
03 Mar 2023
1 min read
0 views
0 Comments
1 min read
274 words

1. A technician needs to install more add-on cards than there are available expansion slots. Which of the following would allow the technician to accomplish this?

A) Array controller
B) Riser card
C) Backplane
D) CPU daughterboard



2. For a technician to test network connectivity to a remote host on a Unix Server which of the following commands should they run?

A) ARP
B) IPCONFIG
C) IFCONFIG
D) PING



3. Maintaining operations in the event of a complete power outage requires a tested and established:

A) site recovery plan
B) business continuity plan
C) hardware maintenance plan
D) incident response plan



4. A technician performs monthly backups on a file server to a NAS device that can hold 1TB of data. The size of the monthly backups has been as follows: Month 1 = 50GB Month 2 = 65GB Month 3 = 80GB Starting with Month 1,based on the current rate of growth,in how many months will the NAS run out of available storage space?

A) 5
B) 9
C) 11
D) 4



5. The Unified Extensible Firmware Interface (UEFI) allows:

A) CPU-dependent architecture and drivers.
B) no network capability in the current release.
C) a non-modular design.
D) the ability to boot from larger than 2GB disks.



1. Right Answer: B
Explanation:

2. Right Answer: D
Explanation:

3. Right Answer: B
Explanation:

4. Right Answer: B
Explanation:

5. Right Answer: D
Explanation:

Mary
Written by
Comments
0